N. Cedar St between Mishawaka Ave and Edgewater Dr


HRP Construction will close N. Cedar St between Mishawaka Ave and Edgewater Dr beginning at 7AM on Monday, April 5th for utility and road reconstruction. Detour signs will be in place to direct traffic to N. Main St via Mishawaka Ave and Lincolnway East. Access for all residents within the closure area will be maintained for the entire duration of this process. Weather permitting, this closure is expected to be in place through early November.

Barricades and signage will be in place during this closure. Motorists are requested to use caution to ensure the safety of the crews working in these areas. Questions regarding this work may be directed to Joe Jonas with HRP Construction Inc at (574) 271-7800